Files
1grzyb1 f7f4e361b0 Keep Rider running for all sticky lines scroll tests
The starter stops the IDE after 10 minutes, and the two sticky lines
tests take about 16 minutes together. The driver connection dropped in
the middle of the second one.

The starter also stops the IDE when any test container finishes, so with
a parameterized test it was gone before @AfterAll. Use two plain tests.
2026-11-19 11:02:59 +01:00
..